Do not let any software impress you!

Only let it convince your intellect.
Slider img 1
Do not look for a business paradise!

It is a waste of time.
Slider img 2
Only yourself can push you uphill.

There is no easy road to prizes.
Slider img 3
Productivity is the name of the game.

And you have to conquer it.
Slider img 4
As long as you understand it,

you will start to build your know-how.
Slider img 5
We can help with that.

We have the tools and the method.
Slider img 6

Activity : Production Scheduling/Massive Production Coordinator

Production Order

Editing Form Used : AU_MASS_PROD_ORDER_E.FM

No
Event Type
Reason
Accept From Production
Accept From Sales
First Date
Last Date
Date
Notes

Defined Quantities

Browsing Form Used : AU_EVENT_PROD_B.FM

Requested Date New Production Date Optimized Production Date Good Quantity Unit Sched Canceled Done Customer Saleman Level Released
6/4/2017 10/4/2017 BendSheet 10100202 1000 Pc Image 3
BendSheet 10100202 1000 Pc 3
4/4/2017 29/3/2017 BendSheet 1010202 3000 Pc Image 3
BendSheet 1010202 3000 Pc 3
5/4/2017 8/4/2017 BendSheet 10110202 1000 Pc Image 3
BendSheet 10110202 1000 Pc 3
28/3/2017 27/3/2017 BendSheet 10120202 1000 Pc Image 3
BendSheet 10120202 1000 Pc 3
7/4/2017 30/3/2017 BendSheet 10130202 1000 Pc Image 3
BendSheet 10130202 1000 Pc 3
200:1-60

Production Scheduling

Browsing Form Used : AU_PRODUCTION_SC.FM

Activity Quantity Measure Scheduled Finished Scheduling Finishing Setup Cleanup Rate/Hr Θέση
CutSheet 10502 1000 500 0
100%
50%
Production Dept
CutSheet 101902 1000 1000 0
100%
0%
Production Dept
CutSheet 102002 1000 700 0
80%
70%
Production Dept
CutSheet 10102 3000 900 0
100%
30%
Production Dept
CutSheet 10202 2500 2500 0
70%
0%
Production Dept
CutSheet 10402 1000 1000 0
30%
0%
Production Dept
CutSheet 10602 1000 1000 0
90%
0%
Production Dept
CutSheet 10702 1000 1000 0
100%
0%
Production Dept
CutSheet 10802 1000 400 0
100%
40%
Production Dept
CutSheet 10902 1000 900 0
100%
90%
Production Dept
100:1-100

Production Execution

Working Instructions


The Activity "Production Scheduling/Massive Production Coordinator" requires us to complete some fields on the form. After filling in the fields, the system will check (during the form posting or the Activity forwarding). In case some required data are missing, the system will not forward the Activity.
Also, upon forwarding, is it possible we need to verify some checkpoints that the configuration of the Procedure or Activity requires. Additionally, the Process Owner of the Procedure could add some checkpoints for the Activity, per case.